NOTICE: Prototype for client review. Design and content only. Placeholder images and demo copy in use. All technical and basic SEO work/review follows sign-off and pre-launch checklist.

★ Building Performance Specialists
Calculations & Certification

SAP
Calculations.

Design-stage and as-built energy calculations for new homes, extensions and conversions. Based in Northern Ireland, EBSNI supports residential project teams across the UK, from the first drawings through to completion and the Energy Performance Certificate.

Part of the Newell Group. Coordinating building compliance, construction and renewable energy expertise.
Illustrative EBSNI-branded energy assessor reviewing dwelling plans and an energy model
Residential Projects

New homes, extensions and conversions

Design to Completion

Design-stage and as-built assessments

Northern Ireland & GB

Project-specific regulatory requirements

SAP Methodology

Applicable edition for your project

The Service

What are
SAP Calculations?

SAP stands for Standard Assessment Procedure. It is a calculation methodology used to assess a dwelling’s energy performance, taking account of its fabric, heating, hot water, ventilation and other specified systems.

The assessment models the proposed specification rather than measuring the household’s actual energy bills. For new homes, it supports the relevant energy compliance submission and the production of an EPC at completion.

EBSNI works with architects, developers and self-builders at design stage and as built. For extensions and conversions, we review the work and establish whether a whole-dwelling assessment or another applicable compliance route is needed.

When You Need It

Residential Energy Requirements
Across the UK & Ireland.

The calculation route depends on the project’s location, type of work and applicable regulatory edition. SAP supports UK dwelling assessments; homes in the Republic of Ireland follow a separate DEAP and BER route.

Northern Ireland

Northern Ireland

Technical Booklet F1 provides guidance on the conservation of fuel and power in dwellings in Northern Ireland. New-dwelling energy calculations form part of the compliance process.

Extensions and conversions have their own provisions. The assessment route depends on the proposed work and the regulations that apply to it.

England and Wales

England & Wales

England and Wales each have their own Approved Document L guidance for dwellings. SAP calculations support the relevant new-home energy compliance assessment.

The requirements and transition arrangements differ. We establish the applicable rules before modelling the proposed specification.

Scotland

Scotland

Section 6 of the Scottish Domestic Technical Handbook addresses energy performance. SAP is used within the relevant domestic energy assessment process.

The building warrant date and applicable handbook determine the assessment requirements. Extensions and conversions need project-specific review.

Republic of Ireland

Republic of Ireland

Domestic energy ratings in the Republic of Ireland use DEAP, the Dwelling Energy Assessment Procedure, rather than SAP.

For Irish projects, ask about BER assessments and the relevant Part L compliance requirements. Explore BER Assessments →

Assessment requirements are confirmed against the project’s jurisdiction, application or warrant date and relevant transitional provisions. A SAP calculation does not replace the other evidence needed for Building Control approval.

Architectural drawings and construction details for design-stage support
Design Stage Support

Resolve the Specification
Before Construction Begins.

The design stage is the time to test the energy strategy. EBSNI reviews the proposed drawings and specification, models the dwelling and identifies where changes may be needed to meet the applicable requirements.

Comparing options early helps the architect and project team make informed decisions about the building fabric, glazing, heating and renewable technologies before products are ordered or details are fixed.

01 Review dwelling geometry, fabric build-ups, glazing and the proposed building services.
02 Assess the proposed specification against the relevant energy performance targets.
03 Coordinate agreed revisions and retain a clear basis for the as-built assessment.
Discuss Your Project
Our Method

A Clear, Structured
Assessment Process.

From the initial drawings to the completed dwelling, we coordinate the information needed for the calculation. Changes during construction are reviewed before the final assessment is issued.

01 / BRIEF

Confirm the Requirements

We review the location, project type, programme, drawings and specification to establish the applicable assessment route.

→
02 / DESIGN

Model the Specification

We prepare the design-stage calculations and discuss specification changes where the proposed design needs improvement.

→
03 / AS BUILT

Review the Evidence

The completed specification, relevant test results and supporting records are checked and the model is updated to reflect the dwelling as built.

→
04 / COMPLETION

Issue the Documents

We complete the final calculation and applicable EPC process once the required information and evidence are in place.

✓
What We Need From You

Preparing Your
Project Information.

A complete information pack helps avoid assumptions and repeat requests. Send the latest revisions and tell us which specifications are confirmed and which are still being developed.

✓ Dimensioned floor plans, elevations, sections and the site address or plot schedule.
✓ Wall, roof and floor build-ups, including insulation materials and thicknesses.
✓ Window and door schedules, with available thermal and glazing performance data.
✓ Heating, hot water, ventilation, controls and any renewable technology specifications.
✓ Available junction details and thermal bridging evidence for the proposed construction.
✓ For the as-built stage: final specifications, relevant air test results and supporting installation evidence.
Programme & turnaround: We confirm an indicative issue date after reviewing the project size, complexity and completeness of the information. Tell us your submission and completion deadlines at enquiry stage.
Frequently Asked Questions

Common Questions.

When do I need SAP calculations?

New dwellings generally need an energy assessment for the relevant Building Regulations process. Extensions and conversions are assessed under their own provisions; a full SAP calculation is not automatically required for every project. Send the location and proposed scope so the correct route can be established.

Should calculations be completed before building starts?

Yes. A design-stage assessment allows the project team to check the proposed specification and consider changes before construction. Leaving the assessment until completion can make any necessary improvements harder to deliver.

What is the difference between design-stage and as-built SAP?

The design-stage assessment models the proposed dwelling and specification. The as-built assessment uses the completed specification and required supporting evidence, including relevant test results, to update the model for final reporting and the EPC process.

What happens if the proposed design does not comply?

We identify the areas affecting the result and discuss possible specification changes with the project team. The model can then be revised to assess the agreed options. A compliant outcome depends on the final design and evidence; no result is guaranteed in advance.

Are SAP calculations the same as an EPC?

No. SAP is a calculation methodology used to assess the dwelling. The Energy Performance Certificate is a separate output of the applicable assessment and lodgement process. Existing-home EPCs commonly use RdSAP, while domestic BER assessments in the Republic of Ireland use DEAP.

How long will the assessment take?

Turnaround depends on the number of dwellings, design complexity and whether the drawings, specifications and evidence are complete. We confirm an indicative programme after the initial review and coordinate the design-stage and completion submissions with your project team.

Illustrative EBSNI-branded assessor reviewing information outside a fictional new dwelling
Example Workflow · Illustrative Image

One Dwelling.
Two Assessment Stages.

Design → Built
A coordinated route from specification to completion

For a new dwelling, the proposed specification is assessed before construction. At completion, the model is updated using the final specification and supporting evidence, keeping the energy assessment aligned with what was actually built.

Discuss Your Project

Discuss Your Residential Project

Send your drawings, location and programme. Our team will confirm the appropriate assessment route. Part of the Newell Group.

Discuss Your Project